Introduction:
Advantage:
* Reflective & durability
* Line smoothing and fluent
* The material is designed & developed to comply with individual international specification
* All national highways
* It can be reflective by the glass beads
 |
 |
Thermoplastic screeding application |
Thermoplastic marking |
Consumption (Actual consumption depends on the roughness of pavement)
Reference Table of Material consumption |
|
Screed |
Thickness |
2mm |
Paint |
About 4.5kg/㎡ |
Primer |
150g/㎡ |
Glass Beads |
350g/㎡ |
Technical Data:
·Curing time:≤3minutes
·Compression strength:≥12(23℃)
·Anti slide swing valve:≥45BPN
Color:White/Yellow/Customize color
Typical installation areas:
·Big and medium city road
·Airport
·Wharf
·Zebra
·Crossing
·Road lane boundary
·Lane edge line
·Bridge,tunnel
·Village,factory road
·Underground garage and underground parking space line
The matters needing to attention during the construction
1. Choose paint should be exquisite,easy to melt and not easy to deposit stratification.
2. It is not suitable for construction when the temperature is too low or the air humidity is too high,construction is prohibited when the road is wet.
3. The application should ensure continuity.After loading a car,it should be done as long as possible without interruption,reducing the number of pauses.
4. The speed of the crossing car should be adjusted according to the fluidity of the coating and the performance of the vehicle according to the actual construction.In principle,the control speed is between 2km/h to 4km/h.
|